The contractor started my tree project yesterday. This is a cost share program with WA State DNR designed for wildfire suppression. Six years ago I had the front 4 acres including around the buildings done by a crew who did the work by hand using chainsaws and a large towed chipper. They did a real nice job that I followed up with cutting out around 300 small stumps left so I could mow some of the area. I cleared the brush and did what locally we call “parking out”.
Fast forward to today (well last fall anyway), DNR had more funding available and I got approved for another project. The cost share is 50/50 so it’s a great deal for the land owner. I’m having another 4.8 acres done so other than an approximate 100 ft strip between my parcel and the one behind me my entire parcel will be done. I tried to get the original contractor to do this work but was unable to work that out. The contractor doing this work now uses an excavator with a masticator cutter head on it. The advantage is that with the boom on the machine he can reach a good sized area without having to drive his tracks everywhere which will cause less of the ground to be torn up. Interesting that with the depth of snow we have right now the tracks are not even reaching the ground so as of now there is nothing getting torn up.
While it’s too early to tell for sure I’m a little bit disappointed with the amount of debris left behind. I knew this would be the case but I was spoiled by the clean job done by the first crew many years ago. The debris field is more pronounced now because of the snow and once it’s gone the debris will blend in with the terrain. Still, I’m thinking there will be more clean up come spring. We’ll see. I will say that as far as the work statement goes which is to remove smaller trees among the larger trees and open the area up it’s looking great. And I believe when he returns on Monday he will have a helper who I’m guessing will use a chainsaw to limb up the remaining trees 10’ from the ground. This is part of the job requirement to keep fire from climbing into the tree tops and crowning.
Here’s some pics of the machine and the work so far. The last pic I took is for a before and after pic. This is the thickest and steepest part of the job and of course the 2D picture doesn’t show the detail as the eye sees.
Fast forward to today (well last fall anyway), DNR had more funding available and I got approved for another project. The cost share is 50/50 so it’s a great deal for the land owner. I’m having another 4.8 acres done so other than an approximate 100 ft strip between my parcel and the one behind me my entire parcel will be done. I tried to get the original contractor to do this work but was unable to work that out. The contractor doing this work now uses an excavator with a masticator cutter head on it. The advantage is that with the boom on the machine he can reach a good sized area without having to drive his tracks everywhere which will cause less of the ground to be torn up. Interesting that with the depth of snow we have right now the tracks are not even reaching the ground so as of now there is nothing getting torn up.
While it’s too early to tell for sure I’m a little bit disappointed with the amount of debris left behind. I knew this would be the case but I was spoiled by the clean job done by the first crew many years ago. The debris field is more pronounced now because of the snow and once it’s gone the debris will blend in with the terrain. Still, I’m thinking there will be more clean up come spring. We’ll see. I will say that as far as the work statement goes which is to remove smaller trees among the larger trees and open the area up it’s looking great. And I believe when he returns on Monday he will have a helper who I’m guessing will use a chainsaw to limb up the remaining trees 10’ from the ground. This is part of the job requirement to keep fire from climbing into the tree tops and crowning.
Here’s some pics of the machine and the work so far. The last pic I took is for a before and after pic. This is the thickest and steepest part of the job and of course the 2D picture doesn’t show the detail as the eye sees.