One of my summer projects. Replacing/Repair the last of 4 corners.

Yesterday, got the metal roof off and today the old trusses. This has been a multiple years long project, funding pieces of the building at a time. Previously, jacked up the roof of the building part to the left, set it on internal temp walls, demolished & replaced the outer walls (new green metal) and set the roof back down. An example of the temp walls built can be seen in these pictures (framing with cross bracing). Tomorrow or the next day the foreground wall with the header and stub wall on top of it comes down. By end of week I hope to have new concrete piers, corner post and door posts in place. Next week going on a trip to the Wallows. After that add the headers above the door locations and frame up the trusses and put on the metal roof. Planning on carriage doors, but may have to work on that in the late fall.
20180715_123651.jpg
20180715_123651.jpg (186.09 KiB) Viewed 4639 times
20180716_144025.jpg
20180716_144025.jpg (208.17 KiB) Viewed 4639 times
1 x
UPDATES: OR passes 114, "one of strictest gun control measures in U.S." https://henryrifleforums.com/viewtopic. ... 34#p213234

User avatar
GFK
Cowboy
Posts: 1918
Joined: Tue Oct 17, 2017 12:56 pm
Location: SE
United States of America

Re: Ag Building Corner Rebuild

Post by GFK » Tue Jul 17, 2018 4:40 am

Looks like a project. What is the end use for the building?
0 x
Actions speak louder than words (Matthew 7:16-20).

User avatar
Mags
Ranch Foreman
Posts: 6883
Joined: Fri Apr 13, 2018 9:40 pm
Location: Tualatin Valley Oregon
United States of America

Re: Ag Building Corner Rebuild

Post by Mags » Tue Jul 17, 2018 12:08 pm

Mostly equipment storage from the rain and in the winter. Have a bench there for maintenance tasks. The end I'm currently working has been used partially for firewood storage. This end is on slope and the corner had slumped. Temp bracing, already removed, prevented use of the big door. Temp bracing? Wasn't so temp. Was that way for years until I could get to reworking this corner. Lots of room in this corner once finished. Will continue to use for firewood and to park a small car used for run about. Cedar and fir tree sap and pollen mix really mess up the finish of a car.
0 x
UPDATES: OR passes 114, "one of strictest gun control measures in U.S." https://henryrifleforums.com/viewtopic. ... 34#p213234

User avatar
JEBar
Town Marshal / Deputy Admin
Posts: 19270
Joined: Sun Mar 20, 2016 10:58 pm
Location: central NC
United States of America

Re: Ag Building Corner Rebuild

Post by JEBar » Tue Jul 17, 2018 12:13 pm

I respect the skills involved in undertaking such an interesting project .... please post progress pictures ....
0 x

User avatar
GFK
Cowboy
Posts: 1918
Joined: Tue Oct 17, 2017 12:56 pm
Location: SE
United States of America

Re: Ag Building Corner Rebuild

Post by GFK » Tue Jul 17, 2018 2:16 pm

Yes. Storage and work areas are good. Would like to have a work area myself. But like a lot of things, time and money. However, it is still on the list.
0 x
Actions speak louder than words (Matthew 7:16-20).

User avatar
Mags
Ranch Foreman
Posts: 6883
Joined: Fri Apr 13, 2018 9:40 pm
Location: Tualatin Valley Oregon
United States of America

Re: Ag Building Corner Rebuild

Post by Mags » Tue Jul 17, 2018 5:14 pm

JEBar wrote:.... please post progress pictures ....
GFK wrote:Yes. Storage and work areas are good.
Thanks. Glad to have your interest. I'll post progress. In the meantime enjoy these from last year. The SW corner.
20170827_190200.jpg
20170827_190200.jpg (205.44 KiB) Viewed 4618 times
20170827_190109.jpg
20170827_190109.jpg (393.52 KiB) Viewed 4618 times
20170907_090705.jpg
20170907_090705.jpg (393.04 KiB) Viewed 4618 times
20170927_103538.jpg
20170927_103538.jpg (289.5 KiB) Viewed 4618 times
20170927_103637.jpg
20170927_103637.jpg (286.6 KiB) Viewed 4618 times
20170927_144002.jpg
20170927_144002.jpg (187.41 KiB) Viewed 4618 times
4 x
UPDATES: OR passes 114, "one of strictest gun control measures in U.S." https://henryrifleforums.com/viewtopic. ... 34#p213234

User avatar
JEBar
Town Marshal / Deputy Admin
Posts: 19270
Joined: Sun Mar 20, 2016 10:58 pm
Location: central NC
United States of America

Re: Ag Building Corner Rebuild

Post by JEBar » Tue Jul 17, 2018 6:13 pm

nicely done indeed ... :D
0 x

User avatar
daytime dave
Administrator / Owner
Posts: 4815
Joined: Sun Mar 20, 2016 10:27 pm
Location: Upstate NY
United States of America

Re: Ag Building Corner Rebuild

Post by daytime dave » Wed Jul 18, 2018 6:41 am

Very nice job. Thank you for taking us along. Great photo record of the job.
0 x
Some days I'm Andy, most days I'm Barney........
Eaglescout, NRA Life Endowment member, BCCI Life Member

User avatar
Mags
Ranch Foreman
Posts: 6883
Joined: Fri Apr 13, 2018 9:40 pm
Location: Tualatin Valley Oregon
United States of America

Re: Ag Building Corner Rebuild

Post by Mags » Thu Jul 19, 2018 9:00 pm

Today's progress update.

Took down the outer wall section. This went as planed. Plan A was to cut it loose and have it free stand after a very slight plop. Then push it over in a controlled fall. Plan B contingency was to cut it loose and be prepared to run. Plan A worked just fine.

With wall down it was now time to set the corner pier block. I bought a new block for this, but ended up not using it. Figured the ground was already compacted from the existing block (est 500 or so lbs), so no need to disturb the compacting underneath. Instead decided to dig out the leeward side and tip it back vertical (tractor), letting cement mix run down the other side. Actually dug it out enough to tip it over about 45' so I could get a healthy amount of cement under it. Then set it back up level and jiggled it into final position to square it up as the corner of the building. Once in final position finished dumping cement around it, rechecked level and position and I was then done in for the day.

Getting the wall down went pretty quick. Wrestling the pier block into position was most of the day's work.

Before wall fall.
20180719_105830_001.jpg
20180719_105830_001.jpg (164.48 KiB) Viewed 4591 times
After wall fall
20180719_122411.jpg
20180719_122411.jpg (173.71 KiB) Viewed 4591 times
Pier block before straightening and repositioning
20180719_122529.jpg
20180719_122529.jpg (310.48 KiB) Viewed 4591 times
Tilted to place cement
20180719_133434.jpg
20180719_133434.jpg (311.08 KiB) Viewed 4591 times
Final position
20180719_143428.jpg
20180719_143428.jpg (297.59 KiB) Viewed 4591 times
1 x
UPDATES: OR passes 114, "one of strictest gun control measures in U.S." https://henryrifleforums.com/viewtopic. ... 34#p213234

User avatar
JEBar
Town Marshal / Deputy Admin
Posts: 19270
Joined: Sun Mar 20, 2016 10:58 pm
Location: central NC
United States of America

Re: Ag Building Corner Rebuild

Post by JEBar » Thu Jul 19, 2018 11:46 pm

nicely done on anchoring the corner pier block .... set in concrete that way, it ought to be there from now on